California is steadily moving homes from gas to electric: heat pumps for heating and cooling, heat pump water heaters, induction ranges, EV chargers. Each needs a circuit, and together they can exceed what an older service was built for.
Start with a load calculation
The size printed on your main breaker is your limit. A load calculation adds up what the home uses and shows how much room is left. It is the first thing we do before quoting new circuits.
Typical new loads
- Heat pump heating and cooling: commonly 30 to 60 amps at 240 volts
- Heat pump water heater: 15 to 30 amps
- Induction range: 40 to 50 amps
- Level 2 EV charger: 30 to 60 amps
- Electric dryer: 30 amps
If the panel is full but capacity is fine
A sub panel or tandem breakers add spaces without changing the service.
If capacity is short
- Choose efficient or lower-amperage equipment, such as a 120 volt heat pump water heater.
- Use circuit-sharing devices that run one large appliance at a time.
- Install a smart panel or energy management system that sheds load automatically.
- Upgrade the service to 200 amps.
Kitchens deserve their own plan
Switching to induction during a remodel is the ideal time to rework kitchen circuits.
Sequence the work
If you will electrify over several years, tell your electrician the whole plan at the start. Sizing the panel and conduit once is far cheaper than revisiting them for every appliance.
Incentives
Federal, state and utility incentives for heat pumps and electrical upgrades change regularly. Check current programs before you commit; some cover part of the cost of the panel work itself.